Gas sampling and gas conditioning technology 2-1.1-ME Operating Instructions Gas Sample Probe Series SP® Version SP2000, SP2000-H, S
10 Gas sampling and gas conditioning technology 2-1.1-ME 10 DESCRIPTION The sample probes are designed for easy installation, reliable and flex
2-1.1-ME Gas sampling and gas conditioning technology 11 11 PROBE DESIGN OF THE HEATED VERSION A complete gas sample probe consists of the he
12 Gas sampling and gas conditioning technology 2-1.1-ME 11.2 TEMPERATURE CONTROLLER In standard version -H, or with option –H320/C temperature
2-1.1-ME Gas sampling and gas conditioning technology 13 Type Max. process temperature Length max. Tube ø o. Temperature sensor SP-30H1.1,
14 Gas sampling and gas conditioning technology 2-1.1-ME The following prefilters can be selected : Prefilter Type Part no. Temp. max. °C Mate
2-1.1-ME Gas sampling and gas conditioning technology 15 NOTE! The equipment should be stored in a protected, frost-free room! 13 PREPAR
16 Gas sampling and gas conditioning technology 2-1.1-ME Before mounting, the probe must be adjusted to the existing operating conditions. Th
2-1.1-ME Gas sampling and gas conditioning technology 17 Remove the probe's protection shield after opening the two clamping devices;
18 Gas sampling and gas conditioning technology 2-1.1-ME 14.2 MOUNTING OF THE SCREWED CONNECTOR AT THE SAMPLE OUTLET Remove heat conducting
2-1.1-ME Gas sampling and gas conditioning technology 19 NOTE! A preferred mounting position is to have the probe with its sample gas outlet
2 Gas sampling and gas conditioning technology 2-1.1-ME Contents 1 General information ...
20 Gas sampling and gas conditioning technology 2-1.1-ME Figure 6 Mounting of sample tube or prefilter
2-1.1-ME Gas sampling and gas conditioning technology 21 14.4 MOUNTING OF SAMPLE LINE Open sample line mounting bracket . Push end of
22 Gas sampling and gas conditioning technology 2-1.1-ME The temperature-resistant, stainless steel connectors supplied by M&C have a do
2-1.1-ME Gas sampling and gas conditioning technology 23 Optionally, the test gas feeding or back purging can be effected via a check valve
24 Gas sampling and gas conditioning technology 2-1.1-ME Figure 9 Electrical connection for SP2000-H, SP2300-H and SP2400-H with thermostat c
2-1.1-ME Gas sampling and gas conditioning technology 25 Figure 10 Electrical connection of external temperature controller e.g. 70304G
26 Gas sampling and gas conditioning technology 2-1.1-ME Figure 11 Electrical connection electronic controller 70304G 16 STARTING Before
2-1.1-ME Gas sampling and gas conditioning technology 27 NOTE! If the rated value temperature needs to be lowered more than 28°C in one step
28 Gas sampling and gas conditioning technology 2-1.1-ME This type of calibration gas feeding is not to be used in case of processes with ov
2-1.1-ME Gas sampling and gas conditioning technology 29 16.3 OPTION BALL VALVE DRIVES For external control of the probe internal ball valves
2-1.1-ME Gas sampling and gas conditioning technology 3 List of illustrations Figure 1 Design of basic version SP2000-H ...
30 Gas sampling and gas conditioning technology 2-1.1-ME 16.3.2 OPTION PNEUMATIC DRIVE MS1 OR MS3 WHEN USING A 3/2-WAY BALL VALVE /3VA 1. M
2-1.1-ME Gas sampling and gas conditioning technology 31 16.3.3 OPTION ELECTRICAL BALL VALVE DRIVE The electrical ball valve drives for contr
32 Gas sampling and gas conditioning technology 2-1.1-ME Figure 16 Connections solenoid valve unit 2 Solenoid valve unit 3 With 3 solenoid
2-1.1-ME Gas sampling and gas conditioning technology 33 Figure 17 Connections solenoid valve unit 3
34 Gas sampling and gas conditioning technology 2-1.1-ME 16.4.1 OPTION DRIVE UNIT 234B FOR THE SOLENOID VALVE UNITS The drive unit 234B is us
2-1.1-ME Gas sampling and gas conditioning technology 35 16.4.1.3 Function and adjustment of the time delay relay K1 After the back purge
36 Gas sampling and gas conditioning technology 2-1.1-ME Figure 18 Wiring plan of control unit 234B 17 MAINTENANCE The safety instructions
2-1.1-ME Gas sampling and gas conditioning technology 37 WARNING! When working during operation: High surface temperatures! Touching t
38 Gas sampling and gas conditioning technology 2-1.1-ME Replace protection shield. Open (if available) ball valve. In order to change p
2-1.1-ME Gas sampling and gas conditioning technology 39 Figure 20 Position of Thermostat and heating cartridge Unscrew the two hexagon
4 Gas sampling and gas conditioning technology 2-1.1-ME Dear customer, we have made up this operating manual in such a way that all nece
40 Gas sampling and gas conditioning technology 2-1.1-ME Figure 22 Dismounted electrical connection box with heating cartridge and thermostat
2-1.1-ME Gas sampling and gas conditioning technology 41 18 SWITCHING OFF CARE! Before switching off, i.e. switching off the heating, the gas
42 Gas sampling and gas conditioning technology 2-1.1-ME 20 CONNECTION AND MOUNTING DATA Gas sample probe type SP2000 SP2000-H SP2300-H S
2-1.1-ME Gas sampling and gas conditioning technology 43 21 APPENDIX Dimensions / construction, drawing no. : 22551010, 22551020 Sampling pos
44 Gas sampling and gas conditioning technology 2-1.1-ME Figure 24 SP2000-H basic version
2-1.1-ME Gas sampling and gas conditioning technology 45 Figure 25 SP2000-H with options
46 Gas sampling and gas conditioning technology 2-1.1-ME Figure 26 High temperature tube aluminium oxide AO
2-1.1-ME Gas sampling and gas conditioning technology 47 Figure 27 Heated sample tubes SP30-H...
48 Gas sampling and gas conditioning technology 2-1.1-ME
2-1.1-ME Gas sampling and gas conditioning technology 49 Figure 28 Test gas feeding and blow back possibilities
2-1.1-ME Gas sampling and gas conditioning technology 5 Head Office M&C TechGroup Germany GmbH Rehhecke 79 40885 Ratingen Germany
50 Gas sampling and gas conditioning technology 2-1.1-ME Figure 29 SP2000-H/3VA/MS-NC-B
2-1.1-ME Gas sampling and gas conditioning technology 51 Figure 30 SP2000-H/3VA/MS-NC-C
52 Gas sampling and gas conditioning technology 2-1.1-ME Figure 31 SP2000-H/3VA/MS-NO-B
2-1.1-ME Gas sampling and gas conditioning technology 53 Figure 32 SP2000-H/3VA/MS-NO-C
6 Gas sampling and gas conditioning technology 2-1.1-ME 3 SAFETY INSTRUCTIONS Please take care of the following basic safety procedures when
2-1.1-ME Gas sampling and gas conditioning technology 7 5 USED TERMS AND SIGNAL INDICATIONS DANGER! This means that death, severe physical
8 Gas sampling and gas conditioning technology 2-1.1-ME Major problems of the extractive continuous gas analysis are the materials contained in
2-1.1-ME Gas sampling and gas conditioning technology 9 8 TECHNICAL DATA Gas sample probe type SP2000 SP2000-H SP2300-H SP2400-H Part no.